The Showmanship judges have a pre-cookoff meeting where teams can serenade them, perform skits, or anything else they think would win them favor. For 2003, a number of the team members discussed the upgraded Jello-shot Delivery System (JDS) v1.1.
At the end of the day, we grab the booth, stacked neatly in my garage each year, load it in a couple pickup trucks, and haul it over to the Gilruth Center for setup. It's done in a couple of hours.
The "before" picture. |
First, frame the base and put in the support structure. |
Then put in the floor. |
Add a couple of walls, which fit into pre-cut slots in the floor. |
Next, install the balcony floor, which gives the walls support. |
Put up the front of the booth and add the ladder in back. |
Install railings in front and on the balcony. |
The main part of the booth is complete! |
Start putting up the thatched roof support beams. |
Behind the booth, our tent is set up. |
Add thatched roof, using discarded palm fronds. |
Install Jello Shot Dispenser, surfboards, bikinis, and trophies (done on the day of the cookoff). |
Last but not least, install team!. |
Once we're done with the booth, it's over to the Cut-Up Party, where we distribute the shirts that we made last week, polish off the skit and assign parts, cut up the meat and veggies, and make the jello shots.
Previously: C-3 days and counting